2026 SEWER LINING PREPARATION
PLEASE BE ADVISED THAT UNIJET IS SCHEDULED TO FLUSH THE SEWER LINES ON YOUR STREET IN PREPARATION FOR SEWER LINING ON:
TUESDAY, JUNE 23, 2026
RAILWAY AVE FROM COCHRANE ST TO BEND IN RD
RAILWAY AVE FROM LYALL TO COCHRANE
CHRISTIE STREET FROM RAILWAY TO DONALD
IN SOME CASES WHERE YOUR SEWER VENT MIGHT BE PLUGGED OR THE MAIN LINES ARE EXTREMELY DIRTY, WATER HAS BEEN KNOWN TO BLOW OUT THROUGH THE TOILET. PLEASE PLACE SOME PLASTIC UNDER THE LID AND COVER THE TOILET BOWL.
PUT THE PLUGS IN YOUR SINKS AND BATHTUBS AND ALSO IN YOUR BASEMENT SINKS AND TUBS.
IF YOU HAVE A FLOOR TRAP IN THE BASEMENT, IT WOULD BE WISE TO PUT A PIECE OF PLASTIC UNDER THE COVER AND PLACE A HEAVY OBJECT ON IT.
IF AFTER THE FLUSHING IS FINISHED AND YOU EXPERIENCE AN ODOR IN
YOUR HOME, RUN SOME WATER IN EVERY SINK THAT CONTAINS A TRAP,
FLUSH THE TOILET AND PUT SOME WATER INTO THE FLOOR DRAIN IN
YOUR BASEMENT AND OPEN THE WNDOWS. THE ODOR SHOULD DISAPPEAR.
WE APOLOGIZE FOR ANY INCONVENIENCE THIS MAY CAUSE. HOWEVER,
THE SEWER SYSTEM NEEDS TO BE MAINTAINED PERIODICALLY TO KEEP
IT RUNNING PROPERLY. IF YOU REQUIRE FURTHER INFORMATION,
PLEASE CONTACT THE MUNICIPAL OFFICE AT 827-2252.
THANK-YOU.
THE COUNCIL
